tabatchnick
Tabatchnick Fine Food Expansion/ Renovation; The Project is a (2) part, projected 2023 construction project.
Updating the existing loading dock doors and levelers to new, state-of-the-art loading dock levelers, shelters and insulated overhead doors; upgrading the existing non-insulated masonry wall construction to a new insulated exterior metal wall panel to significantly improve the ability to maintain temperature within the interior truck loading docks.
Based upon a 2022 approval of a Land Use Application, WSA will implement the design a new 27,176 s.f. footprint, plus 9,173 s.f. second floor addition to the existing facility. The Land Use Application was submitted to the Planning Board by "The Reynolds Group Inc.", and supported by WSA with Architectural design documents. The Land Use Application, which commenced while Oliver Wilhelm was a partner at his prior firm, received final approval in August of 2022. WSA, along with their Design Team will be developing a complete set of Construction Documents in the 3rd & 4th Quarters of 2022, presenting the commensurate applications to Franklin Township to secure all approvals required in support of the 2023 construction.
PROJECT INFO:
Status / Projected Project
Location / 1230 Hamilton St
Somerset, NJ 08873
Area / 27,176 sf
Client's Site / Tabatchnick